Skip to main content

Introduction to the parametrization of sub-grid processes

Sub-grid-scale processes are not explicitly simulated in NWP so must be parameterized. This lesson describes how the parameterization is done at ECMWF and the challenges faced.


Last updated: 13 June 2023
Enrolled students: 100+

Single module

Course Content

  • Introduction to the parametrization of sub-grid processes

Start this course

Self enrolment (Student)
Self enrolment (Student)
Back